CAPELLA LAND JOINT STOCK COMPANY

DEVELOPER OF INDUSTRIAL PARKS IN VIET NAM

THANH LIEM INDUSTRIAL PARK – HA NAM PROVINCE

ADVANTAGES OF INDUSTRIAL PARK

  • Next to National Highway No.1A and National Highway No.21;
  • Only about 4km from Phu Ly City, the center of Ha Nam Province;
  • 55km from Hanoi Capital;
  • Competitive Infrastructure Leasing Fee compared to the area;
  • Corporate Income Tax Incentives;
  • Available land lots with flexible leasing size, can build factories right away;
  • Modern and synchronous technical infrastructure;
  • Abundant labor force due to being located in the area where the focus has begun to develop the Industrial Park, has not been affected by the competition for regional labor from the companies.

INDUSTRIAL PARK SCALE: 293ha.

  • Phase I: 150ha has been basically filled with many big investment projects of Hoa Sen Group, Tan Hiep Phat Group, Tan A Dai Thanh…
  • Phase II: 143ha is expanded investment and attract investment. The leasing term is 50 years from 2019 to 2069. Currently, phase II has successfully attracted many domestic and international investors from Japan, Korea, and Taiwan.

INVESTMENT ATTRACTIVE INDUSTRY

Thanh Liem Industrial Park is a Multi-Industry Industrial Park. EIA of the Industrial Park has been aprroved with the following business activities:

  • Manufacture of electronic components;
  • Garment/Textile;
  • Processing industry (Processing food, Feed mill, Poultry, Aquafeed products);
  • Construction Materials;
  • High technology;
  • Manufacture of medicine and pharmaceutical;
  • Other supporting industries.

LABOR CONDITION

Thanh Liem Industrial Park located in the difficult social and economic area of salary zone 3. This area has abundant young labor force. The people are kind and hardworking. Thanh Liem Industrial Park has advantage of young labor force.

The population of Ha Nam is nearly 900,000 people, with a population density of 913 people/km2. The number of people in working age accounts for 60% of the population, and every year about 13 – 14.5 thousand people reach working age. The population in the area of ​​30km is about 2 million people and the number of people in the working age is about 1.1 million. Ha Nam’s labor force is young, have a level of education from junior high school or higher, in which: most are upper secondary level. The scientific and technical force is abundant with about 12,000 people having college degrees, undergraduate and postgraduate (3% of labor force). The percentage of trained workers accounts for over 50%.

Ha Nam is near Hanoi Capital so it is very convenient to attract high quality human resources for businesses.

Thanh Liem Industrial Park has a convenient location, next to National Highway No.1A and National Highway No.21.

  • Far from Hanoi Capital: 55km
  • Far from Noi Bai Airport: 75km
  • Far from Phu Ly City: 4km
  • Far from Hai Phong: 100km

Thanh Liem Industrial Park is invested with a synchronous infrastructure system to serve businesses in production and business activities in the Industrial Park.

TRAFFIC SYSTEM

Internal roads of 46m, 28m and 20.5m are invested to connect to each land lot with standard roadbed load, ensuring normal operation of container trucks and large trucks.

WATER SUPPLY SYSTEM

Ha Nam Water Company (Wahaco) invest underground system along roads with diameter of water supply pipe D90 to D250. Water is supplied from Song Hong water exploitation plant with a total capacity of 250,000m3/day. Water supply capacity for Thanh Liem Industrial Park is currently 50,000m3 day and night and can be increased more according to the needs of businesses.

DRAIN WATER DRAINAGE SYSTEM

The industrial park arranges two separate rainwater and wastewater drainage systems. The rainwater drainage system includes an open ditch system surrounding the project and an underground sewer system with diameters of D400 – D800 and a box culvert of 2.5m x 2.5m to ensure drainage of the industrial park without flooding. Sewage system with diameter D300 – D600.

WASTE WATER TREATMENT SYSTEM

The wastewater treatment plant has been completed with a total capacity of 6,500m3 day and night, phase 1 has a treatment capacity of 2,000m3 day and night, ensuring the treatment reaches level A parameters according to QCVN 40-2011 issued by the Ministry of Natural Resources and Environment. specified environment.

SERVICE SYSTEMS

BANK
ADMINISTRATION CENTER
HOSPITAL
HOTEL
APARTMENT
GOLF COURSE

INVESTMENT INCENTIVE

The customers invest in Thanh Liem Industrial Park will be get 2 years examption of Corporate Income Tax and deduction 50% of Corporate Income Tax for next 4 years.

INVESTMENT SUPPORT 

The Owner of Thanh Liem Industrial Park would like to provide support service of initial investment procedures for investors such as: apply for ERC and IRC; Loan from Bank.

035 323 9989