Tam Thang 2 Industrial Park belong to Chu Lai Open Economic Zone in Quang Nam Province. There are three ways to conect our Industrial Park, including National Road No 1A, Coastal Road and Da Nang – Quang Ngai express way. This industrial Park has convinent transportation conections to conect seaports, airports, city center, tourist area, urban area,… They create a very good environment for investment and living.
Total land area: 103ha
Leasing team: 50 years (2017 – 2067)
Tam Thang 2 Industrial Park is a multi-industrial park. EIA of the Industrial Park has been aprroved with the following business activities:
Population of Quang Nam: 1,48 million. 60% is in working age.
Quang Nam has 2 Universities, 10 Colleges and 40 Vocational Training Centers.
Quang Nam locates near big education centers of Vietnam such as: Dang Nang, Hue, Quy Nhon.
Tam Thang 2 Industrial Park located in the difficult social and economic area of salary zone 3. This area has abundant young labor force. The people are kind and hardworking. Tam Thang 2 Industrial Park has advantage of young labor force. 60% of Quang Nam Province is in working age.
Tam Thang II IP located in Chu Lai Open Economic Zone, Thang Binh District, Quang Nam Province. Itis convenient to connect to Seaport, Airport and Big City centers or the nearby Urban Areas, Hotels & Golfs, Trade & Service Centers by Road No.1, Modern Along Coastal Road and new Highway Quang Ngai – Quang Nam – Da Nang.
Thành phố Đà Nẵng: Da Nang City
Sân bay Chu Lai: Chu Lai Airport
Thành phố Quảng Ngãi: Quang Ngai City
Thành phố Hội An: Hoi An City
Thành phố Tam Kỳ: Tam Ky City
TAM THANG 2 Industrial Park is invested in a synchronous infrastructure system for businesses operating in the area.
The road is spread asphalt with heavy loading to ensure transportation to each land lot
Main road: 36m.
Branch road: 22.5m
STABLE POWER SUPPLY SYSTEM
The electricity line of 22KV is set up along the roads of the Industrial Park and connected to every factory with sufficient and stable supplying capacity.
The water supplying pipe is set up underground and connected to every factory with capacity up to 100,000m3/day.
The drainage culvert system is set up along with the roads of the Industrial Park to guarantee non-flood.
The industrial park has two separate rainwater and wastewater drainage systems. Rainwater drainage system includes open ditch system surrounding the project and underground sewer system with diameter of D600 – D1200 and the drain of 1.2m x 1.5m to ensure drainage of the industrial park without being flooded
Building the wastewater treatment system with the capacity is 3,000m3/day and ensuring the processing to reach A level according to QCVN 40-2011 prescribed by the Ministry of Natural Resources and Environment.
INVESTMENT INCENTIVE
4 years examption of Corporate Income Tax and deduction 50% of Corporate Income Tax for next 9 years.
The applied tax: 10% for first 15 year
INVESTMENT SUPPORT
The Owner of Tam Thang Industrial Park would like to provide support service of initial investment procedures for investors such as: apply for ERC and IRC; Loan from Bank.